Validation · EMC · Pre-compliance
Find the failure on our bench, not at the test house
A failure discovered at an accredited laboratory costs a re-spin, a re-booking and a quarter of the programme. The same failure found on our bench costs a week. That is the entire argument for pre-compliance.
What we run
ESD
Contact and air discharge to 16 kV and 30 kV.
Automotive transients
ISO 7637-2 transients and ISO 16750-2 electrical loads, pulses 1 to 5 including load dump, cranking and reverse polarity.
Immunity and emissions
Radiated immunity pre-checks against ISO 11452-2, and emissions pre-scan to CISPR 25 and CISPR 11.
Industrial immunity
Fast transients, surge, dips and RF immunity to the IEC 61000-4 series.
Climatic and mechanical
Profiling to IEC 60068.
24/7 soak
Continuous running under repeated load cycles.
What you get
A test plan
Written against the clauses that apply.
Measurement data
With the set-up recorded.
A ranked defect list
Ordered by fix cost.
An evidence pack
Formatted for the laboratory you will use.
The certification path
Formal certification is obtained at accredited laboratories. We prepare the evidence, run the pre-compliance cycle and manage the test-house interface — we do not claim to be the laboratory.
Bring us the board before the test house sees it
See also the standards we design to and Automotive & EV.
